000 | nam a22 7a 4500 | ||
---|---|---|---|
999 |
_c14342 _d14342 |
||
005 | 20220418113112.0 | ||
008 | 220323b ||||| |||| 00| 0 tha d | ||
040 |
_aRID _beng _cRID |
||
082 |
_aRID. 354.3 _bS7F 2021 V.2/9 |
||
110 | _aSamart Engineering Consultants. | ||
245 | _aFeasibility Study and Enviromental Impact Assessment Control Structures in the Ping River Downstream of Bhumibol Dam Tak, Kamphaeng Phet and Nakhon Sawan Provinces Final Report Feasibility Study and Enviromental Impact Assessment Nong Khwan Control Structure, Khlong Khlung District Kamphaeng Phet Province Volume 2/9 Executive Summary Report (FS). | ||
260 |
_aBangkok : _bRoyal Irrigation Department, _c2021. |
||
300 |
_a1 Book : _billustrations : _c30 cm. |
||
650 |
_aWater _xEffect of environment on. |
||
650 |
_aน้ำ _xผลกระทบจากสิ่งแวดล้อม. |
||
650 | _aNong Khwan Control Structure. | ||
650 | _aอาคารบังคับน้ำหนองขวัญ. | ||
710 | _aThammachart Consultant. | ||
710 | _aSigma Hydro Consultant. | ||
942 |
_2ddc _c12 |
||
998 | _cNongluk. |