000 nam a22 7a 4500
999 _c14342
_d14342
005 20220418113112.0
008 220323b ||||| |||| 00| 0 tha d
040 _aRID
_beng
_cRID
082 _aRID. 354.3
_bS7F 2021 V.2/9
110 _aSamart Engineering Consultants.
245 _aFeasibility Study and Enviromental Impact Assessment Control Structures in the Ping River Downstream of Bhumibol Dam Tak, Kamphaeng Phet and Nakhon Sawan Provinces Final Report Feasibility Study and Enviromental Impact Assessment Nong Khwan Control Structure, Khlong Khlung District Kamphaeng Phet Province Volume 2/9 Executive Summary Report (FS).
260 _aBangkok :
_bRoyal Irrigation Department,
_c2021.
300 _a1 Book :
_billustrations :
_c30 cm.
650 _aWater
_xEffect of environment on.
650 _aน้ำ
_xผลกระทบจากสิ่งแวดล้อม.
650 _aNong Khwan Control Structure.
650 _aอาคารบังคับน้ำหนองขวัญ.
710 _aThammachart Consultant.
710 _aSigma Hydro Consultant.
942 _2ddc
_c12
998 _cNongluk.