000 nam a22 7a 4500
999 _c14341
_d14341
005 20220418143453.0
008 220323b ||||| |||| 00| 0 tha d
040 _aRID
_beng
_cRID
082 _aRID. 354.3
_bS7F 2021 V.2/9
110 _aSamart Engineering Consultants.
245 _aFeasibility Study and Enviromental Impact Assessment Control Structures in the Ping River Downstream of Bhumibol Dam Tak, Kamphaeng Phet and Nakhon Sawan Provinces Final Report Feasibility Study and Enviromental Impact Assessment Khlong Krathin Control Structure, Banphot Phisai District Nakhon Sawan Province Volume 2/9 Executive Summary Report (FS).
260 _aBangkok :
_bRoyal Irrigation Department,
_c2021.
300 _a1 Book :
_billustrations ;
_c30 cm.
650 _aWater
_xEffect of environment on.
650 _aน้ำ
_xผลกระทบจากสิ่งแวดล้อม.
650 _aKhlong Krathin Control Structure.
650 _aอาคารบังคับน้ำคลองกระถิน.
710 _aThammachart Consultant.
710 _aSigma Hydro Consultant.
942 _2ddc
_c12
998 _cนงลักษ์.